HDB Electrical Works Guide: Electrical Loading (30A vs 40A), Permits and Rules

HDB electrical DB box with main switch

Planning to add an aircon, a new power point or a water heater, or to rewire your HDB flat? HDB has clear rules on what you can do, when you need a permit, and who must do the work. This guide sums up HDB’s and EMA’s official guidelines in plain English, so you can plan before you book an electrician.

Check Your HDB Electrical Loading First (30A or 40A)

Your flat’s electrical loading is the rating of the main switch in your DB box. It decides how much power your home can safely draw at once, and whether some works need an HDB permit.

Your blockMain switchWhat it means
Completed on or after 1 January 199440AHigher electrical loading
Older block upgraded under MUP or HIP40A (upgraded)Treated as higher electrical loading
Older block, not upgradedUsually 30ASome works need an HDB permit (see below)

How to check: look at the rating printed on the main switch in your DB box, or use HDB’s Electrical Loading of Your HDB Block e-Service with your block details. HDB is also upgrading about 1,500 older blocks from 30A to 40A per unit under its Electrical Load Upgrading Programme (ELUP), which it targets to complete by 2030.

Not sure what a main switch is? Read our guide What is a DB box?

Which Electrical Works Need an HDB Permit?

According to HDB’s guidelines:

  • Flats with a 30A main switch need an HDB permit to install a new 15A power point (for example, for an aircon or other high-power appliance) or a 20A isolator.
  • Flats with a 40A main switch, or flats upgraded under MUP or HIP, do not need a permit for these. The work must still follow HDB’s guidelines.
  • A 20A isolator is only allowed for aircon installation, and appliances rated above 15A are not allowed.
  • Your Licensed Electrical Worker (LEW) can apply for the Electrical / Air-Conditioner Installation Permit on your behalf.

Works done without a required permit, or not done according to the guidelines, are treated as unauthorised works. HDB can require you to remove them and reinstate the flat.

Electrical Works That Do Not Need a Permit

These works do not need an HDB permit, but they must still follow HDB’s conditions:

  • Additional lighting points, fan points and 13A power points, extension of wiring, or rewiring. There is no limit on the number, but the total is limited by your main switch rating.
  • Covering wiring with PVC trunking, or encasing surface wiring in metal or high-impact PVC conduit.
  • Changing or adding an RCCB, ELCB, MCB, socket outlet or main switch.
  • Ceiling fans: the fan must weigh no more than 6kg, with at least 2.4m clear height from the floor to the blades.

For new wiring or wiring extensions, the SP Services form CS/5H, endorsed by HDB, must be submitted to SP Services for testing.

Water Heater, Oven and Washing Machine Limits (30A Flats)

For flats with a 30A main switch, HDB limits each appliance:

  • Instantaneous water heater, washing machine with heater, electric oven or cooker unit: up to 3kW each
  • Storage water heater: up to 1.5kW

For 40A flats, there is no limit on the number of appliances, but each must not exceed a 15A power point and the total is limited by the main switch. Need a new point? See our water heater point installation service.

Who Is Allowed to Do Electrical Work in an HDB Flat?

  • HDB requires all wiring installation work to be carried out by an EMA licensed electrical worker (LEW), and aircons to be installed by a BCA-trained aircon installer.
  • EMA requires electrical works at your premises (rewiring, alterations, repairs and replacements to the electrical installation) to be carried out by LEWs.
  • After electrical renovation work, you apply to SP Services for testing through your LEW.

Other HDB Rules to Know

  • Working hours: no work before 8am or after 6pm. Noisy work only on weekdays, 9am to 5pm.
  • Time limit: approved electrical work must be done within 1 month of the permit for existing blocks, and within 3 months for newly completed blocks.
  • Concealed wiring: no embedding of wiring conduits in concrete slabs, beams, columns, walls or wall plaster. Drill carefully to avoid hidden conduits.
  • Nails and screws (power-driven) must not exceed 6mm in diameter or 40mm in depth.

How Old Is Your Wiring?

HDB estimates the life span of PVC electrical cables at about 25 years on average, and advises replacing wiring when it is past its life span or has deteriorated. An LEW can advise on whether your wiring needs replacing.

EMA also notes that HDB flats built before 1985 did not come with an RCCB or ELCB, unless the owner installed one later. If your DB box has no RCCB (the switch with a TEST button), have one installed. It protects you from electric shock.

Signs your wiring needs checking: frequent power trips, warm or burnt sockets, flickering lights, or an old DB box.

Sources

HDB: Renovation Guidelines for Electrical Works, and Applying for Approval. EMA: Electrical Safety. MND: written answer on HDB’s Electrical Load Upgrading Programme (May 2023). Rules can change, so always check the latest guidelines on HDB’s website before you start.

Frequently Asked Questions

What is the electrical loading of my HDB flat?

Blocks completed on or after 1 January 1994, or upgraded under MUP or HIP, have a 40A main switch (higher electrical loading). Older blocks that have not been upgraded usually have 30A. Check the rating on your main switch, or use HDB’s Electrical Loading e-Service.

Do I need an HDB permit to install an aircon power point?

Only if your flat has a 30A main switch. You then need an HDB permit for a new 15A power point or a 20A isolator. Flats with a 40A main switch, or flats upgraded under MUP or HIP, do not need this permit, but the work must still follow HDB’s guidelines.

Do I need a permit to add lights, fans or 13A sockets in my HDB flat?

No. Extra lighting points, fan points, 13A power points and rewiring do not need an HDB permit, but they must follow HDB’s guidelines. New wiring must be tested by SP Services using form CS/5H endorsed by HDB.

Who can do electrical work in an HDB flat?

HDB requires all wiring installation work to be carried out by an EMA licensed electrical worker (LEW). EMA also requires rewiring, alterations, repairs and replacements to your electrical installation to be done by an LEW.

How often should HDB wiring be replaced?

HDB estimates the average life span of PVC electrical cables at about 25 years. Replace the wiring when it is past its life span or has deteriorated. An LEW can check its condition.

What time can electrical work be done in an HDB flat?

Between 8am and 6pm. Noisy work is only allowed on weekdays from 9am to 5pm, and not on weekends or public holidays.